How long does it take to build a website?

Ben Brailsford-ChambersClever Rabbit · Updated 25 October 2026 · 5 min read
Short answer

A small business website usually takes four to six weeks from kick-off to launch, once your words and photos are ready. Bigger bespoke websites and online shops take longer, often six to twelve weeks. The biggest cause of delay is almost always waiting for content and feedback, not the build itself.

Typical timelines

Type of projectTypical timeWhat decides it
Small business website (up to five pages)4 to 6 weeksHow ready your words and photos are
Bespoke website6 to 10 weeksNumber of pages, custom features, animation
Online shop6 to 12 weeksNumber of products, options, delivery rules and links to other systems
Redesign of an existing websiteSimilar to a new websiteHow much content is being kept, rewritten or moved

These are typical ranges, not promises: every quote should give you a timeline for your own project.

How a website project runs

  1. Kick-off (week 1). You send your words, photos and logins, and the pages are planned.
  2. Design (weeks 1 to 2). You see the homepage design first and give feedback.
  3. Build (weeks 2 to 4). Every page, form and feature is built and tested on phones, tablets and computers.
  4. Changes and launch (weeks 4 to 6). Rounds of changes, then it goes live, followed by checks that everything works.

What slows a website down

  • Waiting for content. Words and photos are the number one cause of delay. Have them ready, or ask for writing to be included.
  • Slow feedback. A week to reply to a design adds a week to the project.
  • Too many decision-makers. Agree who signs things off before you start.
  • Changing the brief halfway. New ideas are fine, but they add time. Save them for after launch if you can.
  • Domain and hosting logins. Find them early. They’re often with someone who set things up years ago.

How to keep yours on track

  1. Gather your words, photos, logo and logins before kick-off.
  2. Book time in your diary to review designs within a couple of days.
  3. Give one combined list of changes each round, not a drip of emails.
  4. Agree a launch date with a little room to spare.

How I work

Every quote I send includes the timeline, and the clock starts once payment has cleared and I have what I need from you. A starter website usually takes four to six weeks; I’ll tell you upfront if yours will take longer and why. If a project goes quiet for more than 60 days, my terms allow me to treat it as finished, so nothing stays half-done forever.

When you don’t need me

If you need something online this week, a simple website builder page will do while you plan the real thing. When you’re ready for a website built properly, see my website design service.

Written by Ben Brailsford-Chambers, the web designer behind Clever Rabbit in Oldbury. Last updated 25 October 2026. More guides

(Questions)

Quick answers.

Can a website be built in a week?

A very simple site can, if all the content is ready and decisions are quick. Most small business websites take four to six weeks to do properly.

Why do websites take so long?

The build itself is rarely the slow part. Most of the time goes on gathering words and photos, and waiting for feedback and decisions.

How long does an online shop take?

Usually six to twelve weeks, depending on how many products and options you have and how ready the product photos and descriptions are.

What do I need to provide?

Your words (or a brief for them to be written), photos, logo, logins for your domain and any existing website, and timely feedback.